Thursday, July 18, 2013

Industrial Effluent Treatment System / Waste Water Treatment Plant solutions





Experience in industrial effluent treatment system (IETS) design, system handling, and operations in biological process (BP) and physical chemical process (PCP).

Awarded a Certified Environmental Professional in Industrial Effluent Treatment System Operation (CePIETSO) for both BP and PCP by Department of Environment (DOE).
CePIETSO-BP 00165.

Experience in plant operation to comply to the Industrial Effluent Regulation (IER) 2009 and implementation of Performance Monitoring (PM) based on the Regulation 9 of IER 2009.

Experience in operating 200m3/day influent with 900m3 aeration tank for the biological process.
Familiar with the suspended growth activated sludge system design with stage 2 chemical process involving pH adjustment, coagulation, and flocculation.
900m3 aeration tank with fine bubbles diffusers

Exposed with tertiary treatment consisting of multi media sand filter and activated carbon filter to ensure the final discharge conform to the IER standard.
Aeration tank with bacteria in action

Supply of bacteria for the aeration tank (biological process)

Pumps repairs, service, and maintenance
 Involved also in the plant maintenance of the WWTP equipment such as pumps (submersible, diaphragm, etc), motor, diffusers, valves, blower, and compressor.

IETS wiring (installation and repair) for pumps and WWTP equipment